搜索
line

Flexible OCS parts and components

According to the requirements in TB/T 2075 “Standard for OCS (Overhead contact line system) of electrified railway”, OCS parts and components consist of 24 parts, including: cantilever assembly, 2. Cantilever bracket, 3. steady arm with stop device, 4. steady arm without stop device, 5. Terminal anchor clamp, 6. Mid-point anchor assembly, 7. Integrated dropper and dropper clamp, 8. Stitch wire assembly, 9. Splice, 10. Overhead crossing, 11. Electrical connection assembly, 12. Pulley tensioning device, 13. Tooth wheel tensioning device; 14. Spring tensioning device; 15. Balance weight and balance weight guide frame, 16. Fixing device for Head span support, 17. Connection device of head span structure, 18. Suspension device of head span structure; 19. Earthing clamp and connection device, 20. Multi-function part for additional wire; 21. Horizontal suspension device in tunnel, 22. Support and steady device in tunnel, 23. Anchoring device in tunnel, 24. Preformed fittings

line

Composite insulator for OCS

Composite insulator which is at least made of core rod and sheds and equipped with rod shade insulators with fittings on ends. According to the requirements in TB/T 3199.2 “Insulators for OCS (Overhead contact line system) of electrified railway” “Part 2: rod shape composite insulators, insulators include five categories: composite insulators for cantilever, composite insulators on pole, composite insulators on cross bar, strain composite insulators (for suspension installation), composite insulators (for suspension installation) for registration

line

Rigid OCS parts and components

Rigid OCS parts and components consist of contact line, support and registration assembly, mid-point anchor assembly, electrical connection part, earthing part.

line

Sectional insulator

insulation parts and guide component are pinched in contact line to realize electrical sectioning between two adjacent contact lines of the same phase and allow passage of pantograph with uninterrupted current collection.

NEWS

 ( to know about more news)

Commendation for the New Beijing-Zhangjiakou Railway

Commendation for the New Beijing-Zhangjiakou Railway

The Beijing-Zhangjiakou Railway Project supplied by Kaida Railway Construction and Kaida High-Power Electric Co., Ltd. won the "National Quality Engineering Award" Aedas Railway Construction and Aedas High-Power Branch were commended by the "Beijing-Zhangjiakou Railway Project Department"
Industry news

Industry news

The industry standard of TB/T 2075.1-2020 "Electrified Railway Catenary Components" was officially released by the State Railway Administration on October 30, 2020, and officially implemented on May 1, 2121.
announcement

announcement

Hebei Zeda Electric Co., Ltd. was formally established on July 21, 2020

Sales Department 

(to provide service with best effort)

 

line

KaiDa TieJian

provide service with respect to OCS parts and components

line

KaiDa GaoDian

provide service with respect to composite insulators

line

Continually updated

provide service with respect to glass core rod 

LEGAL NOTES

CONTACT

Add:Cangzhou City, Hebei Province
Tel:
+86 317 3607111
Web:http://www.kaidachina.cn
Mail:13501563959@139.com

Wechat:13501563959

Msn:13501563959

 

Copyright © 2020         Kaida Railway Construction Electrified Railway Equipment Co., Ltd.            Powered by : www.300.cn   冀ICP备2020027750号-1

Copyright © 2020 Kaida Railway Construction Electrified Railway Equipment Co., Ltd.

Powered by : www.300.cn   冀ICP备********号-1